Jurisdiction- Puri Irrigation Division incharge of Irrigation Command of Daya Bhargabi Deak which is part
of Delta stage.It is a major Irrigation Project.It Irrigates 38,430.43 hs. If certified ayacut which is being
commanded by two branch canals namely Sakhigopal branch canal & Kanas branch canal. The length of
sakhigopal branch canal is 43.830 Kms.which runs by the side of Bhargabi right embankment.Similarly the
Kans branch canal is 40110 Kms which runs by the side of Daya left embankment.It is a canal net works
consists 9 nos.of distributaries and 162 nos.of minors and sub minors length 602 kms in addition to the above
Irrigation systems this division looks after some major flood ans saline embankment as detailed below.
Capital Embankment.
| A |
Daya left embankment 00 kms.is 60kms. |
60.00kms. |
| B |
Right Embankment 002.67 .50Kms |
67.50 Kms |
| C |
Bhargabi left Embankment 30kms.to 85 Kms. |
48.00 Kms. |
| D |
Bhargabi Ratnachira right and left embankment |
22.00.kms. |
| E |
Luna right embankment |
26 .00Kms |
| F |
Luna left embankment |
27.00 Kms |
| Total |
270.50 Kms |
| Other Agricultural Embankment |
51.00Kms. Kms. |
| Test Relief Embankment |
120.50 Kms. |
| Saline Embankment |
393.21 Kms |
| Total. |
563.21 Kms. |
Details of canals
The details of canal system under Mahanadi Delta stage-II & Gobadhanpur barrage system of
puri Irrigation division are given below.
1.Sakhigopal branch canal system 26772.20 ha
2.Kanas canal system 10666.23 ha
3.Canal system under Gobardhanpur barrage 5000.00 ha
Total - 44438.43 ha
Rivers and Irrigation Projects
1.Daya
2.Bhargabi
3.Kusabhadra
4.Devi
5.Luni
6.Makara
7.Ratnachira
8.Rajua
9.Malaguni
mahanadi Delta –Stage –II
38430.43 Hects land in Irrigated.